Case Studies

Our Real Work

Work backed by contracts, handover documents or live systems — each case shows its real status.

Other case studies

Smart Tech Industry — Deblu (Healthy Walk) brand
evidence
evidence
evidence
WMS + AGV (goods-to-person) Live since 2022 Real evidence

Smart Tech Industry — Deblu (Healthy Walk) brand

Health footwear

Problem
Pickers walking SKU-to-SKU in a large warehouse wasted hours; the existing WMS no longer fit, and stock counts kept drifting.
Solution
TW built a Thai-language WMS and integrated 5 Quicktron AGVs in a goods-to-person flow (robots bring the rack to the picker). Installed Dec 2021 – Feb 2022.
Real outcome
Live since 2022 with real-time stock accuracy, extended with ERP and an e-commerce WMS in 2025–2026.
View full case + customer video
Loha Prathip (LPI)
evidence
evidence
evidence
Custom WMS In production Real evidence

Loha Prathip (LPI)

Racking & storage-system manufacturer

Problem
Multiple warehouse types (Raw Material, FG, Tooling) tied to BOM, jobs and suppliers; the old system could not handle the workflow and had no stock alerts.
Solution
A Thai-language WMS built by TW and running under the customer brand RACKRANGE™ — inbound/outbound, BOM, approvals, QR labels, 3-tier stock alerts, multi-warehouse, with a 233-page user manual.
Real outcome
LPI runs every warehouse process on it, and TW extended it into a multi-tenant WMS platform (asrswms.com) for ASRS Kontiki.
View full case + real UI screens
AEROTHAI — Aeronautical Radio of Thailand
evidence
evidence
evidence
Electrical Monitoring (EMMC) + 3D Supported since 2021 Real evidence

AEROTHAI — Aeronautical Radio of Thailand

Civil aviation

Problem
Live status of the electrical systems at control towers and navaid sites nationwide — power meters, UPS, generators and fuel levels.
Solution
Maintain, repair and extend the EMMC system — airport map, 3D site view and LINE/SMS alarms, plus API and field-equipment upgrades.
Real outcome
Running at about 40 sites nationwide, with TW supporting the system continuously since 2021.
GC Logistics Solutions (now WHA GC Logistics)
evidence
evidence
evidence
MES + OEE Dashboard Phase 2 handed over Aug 2025 Real evidence

GC Logistics Solutions (now WHA GC Logistics)

Petrochemical logistics

Problem
Needed MES for the Small Bag line plus real-time downtime and plant performance reporting.
Solution
MES + OEE Dashboard + Downtime Report across every line — integrated with PLCs, scales, printers and vibration sensors on 29 machines.
Real outcome
Executives see line-level OEE in real time and spot losses instantly — MES Phase 2 handed over in August 2025.
General Chemicals (Thailand)
evidence
evidence
evidence
OEE + Realtime Monitoring Live · ongoing support Real evidence

General Chemicals (Thailand)

Chemicals

Problem
Needed real-time machine OEE and production status, plus tracking of stock on shelves.
Solution
Upgraded the OEE system, added a realtime monitor matching the plant layout and a scan-in/scan-out tracking shelf with alerts — PLC/HMI connected through gateways.
Real outcome
Machine-level OEE and status in real time, supported by TW continuously since 2022.
Rajamangala University of Technology Phra Nakhon (RMUTP)
evidence
evidence
evidence
Industry 4.0 Robot Training Set Delivered Apr 2023 Real evidence

Rajamangala University of Technology Phra Nakhon (RMUTP)

Education / industrial robotics

Problem
Needed an Industry 4.0 training set so students can practise robotics, CAM and real PCB production.
Solution
Three 6-axis robot cells with gripper, milling and hot-wire tools, RoboDK and CAM software, and a PCB plotter — installed with user training.
Real outcome
Won by public e-bidding and fully delivered in April 2023.
Chiang Mai University
evidence
evidence
evidence
WMS + WCS + Hai Robotics Live Jul 2026 Real evidence

Chiang Mai University

Education / automated-warehouse lab

Problem
Needed an automated-warehouse teaching lab where students drive real robots.
Solution
TW WMS + WCS controlling three Hai Robotics robots (one ACR, two tote robots) through the vendor ESS, with Thai manuals and student worksheets.
Real outcome
Live since July 2026 for hands-on receiving, storage and picking with robots.
Electronic driving-licence test system — Lao PDR
evidence
evidence
evidence
E-Driving Test System Delivered 2023–2024 Real evidence

Electronic driving-licence test system — Lao PDR

Government / transport (international)

Problem
Practical driving tests were scored by examiners by eye; the authority wanted accurate, auditable scoring.
Solution
E-Driving uses rover + base-station GPS with centimetre accuracy, an in-car IoT box and cameras to score every test manoeuvre automatically — delivered with the main contractor.
Real outcome
Installed at the Savannakhet test track; final milestone handed over in February 2024.
Store Mate
Custom ERP In production

Store Mate

Tool-steel service centre

Problem
Sales, cutting, production orders and tool-steel stock lived in many spreadsheets, making each order hard to track.
Solution
A web ERP designed around a steel service centre — work orders, purchase requests, production planning, stock and reports, with a user manual.
Real outcome
In production since 2025 and extended continuously at the customer’s request in 2026.
AEROTHAI — Headquarters (BEM)
evidence
evidence
evidence
Building Energy Management Ongoing support Real evidence

AEROTHAI — Headquarters (BEM)

Civil aviation / office campus

Problem
Real-time energy use across the 10-building headquarters campus, with 3D views and multi-zone device management.
Solution
BEM — 244 digital meters over 15 gateways, 3D facility view, site management console and zone/device management.
Real outcome
Maintained continuously; the customer issued a certificate of performance in September 2022.
Siam Kubota
Conveyor Control Software Delivered 2022 Real evidence

Siam Kubota

Agricultural machinery / parts centre

Problem
The parts centre must sort cartons across many conveyor lanes correctly and re-assign lanes per job.
Solution
Upgraded the sorting-conveyor control software (LabVIEW + PLC + code readers) and replaced the sensor set.
Real outcome
Delivered under a 2022 PO, building on the original system the founding team developed in 2019.
Mitsubishi Elevator Asia
AMR Intralogistics Delivered via TSC Real evidence

Mitsubishi Elevator Asia

Elevator manufacturing

Problem
Staff walked parts between floors 1–3 of the plant many times a day.
Solution
An AMR carries parts between floors, called from 13 call points — delivered through TSC, the company TW co-founded.
Real outcome
About 80% less walking, about 12% more cycles and a payback of about 2.2 years (customer-reported figures).
Panasonic Manufacturing
MES + AMR Delivered via TSC

Panasonic Manufacturing

Electrical appliance manufacturing

Problem
Line-side parts replenishment took dozens of walking trips a day, with a risk of picking errors.
Solution
MES counts parts from the PLC and dispatches an AMR to replenish automatically, with Poka-Yoke checks — delivered through TSC, the company TW co-founded.
Real outcome
Less replenishment walking for operators and fewer line-side mistakes.
Pakkret Animal Hospital
Hospital Information System In UAT

Pakkret Animal Hospital

Healthcare / veterinary hospital

Problem
Medical records, treatment, pharmacy stock and billing ran on separate systems.
Solution
A 12-module hospital information system designed around the hospital’s real workflow — OPD registration, records, treatment, pharmacy and billing.
Real outcome
Contract signed October 2023 · Phase 1.5 in user acceptance testing in 2026.
Trusted by

Customers who trust us

Over 30 organizations in Thailand and abroad since 2021

FLAGSHIP
Airport Authority Hong Kong
Hong Kong International Airport
Mitsubishi Elevator Asia
Siam Kubota
Smart Tech Industry (Deblu)
RMUTP
Pakkret Animal Hospital
Advance Tech Center
Loha Prathip (LPI)
AEROTHAI
WHA GC Logistics
General Chemicals (Thailand)
Panasonic Manufacturing
Chiang Mai University
Store Mate
SG-Tech (Thailand)
Aicon Technology
30+ organizations in total.

Ready to upgrade your factory?

Book a free consultation with our engineering team.